REFERENCES

WORKS COMPLETED

2014 - 2018: Annual maintenance contract for the submerged structures of PUMA ENERGY wharf

AUGUST 2017 JICA-ORICONTROL

Shipping underwater inspection in stores 5 and 6 of the Autonomous Port of Abidjan at Cerealier Port construction project

MARCH 2017- PETROCI

Works of removal and installation of chains of shields shock absorbers –dock PETROCI

WHARF CONSTRUCTION -MONO RIVER -TOGO

RIPE BERLINER PLATFORM CONSTRUCTION –COTE D’IVOIRE

WHARF CONSTRUCTION –JACQUEVILLE COTE D’IVOIRE


PETROCI CI 11 - 2023 : Underwater pipeline installation
Vidéos
Images
FOXTROT August 2022 Underwater inspection of pump casings at Foxtrot April 2022: Multibeam survey for pipeline 8'' Platform Panthere C Company: PETROCI CI 11
Feb 2022: Installation of PLIDCO clamps on leak pipe line 8'' panthere C Company: PETROCI CI 11
janv.-22: Zodiac bailout at the platform Gulftide Company: PETROCI CI 11
sept.-18: Underwater inspection by leak rov on pipeline line 8'' Panthere c Company: PETROCI CI 11
nov.-19: Cleaning and installation of anodes on the submerged structures of the platform Gulftide, Lion A, LionB and Panthere C Company: PETROCI CI 11
july 2019: Underwater inspection with video camera pipe 30 Panthere C Company: PETROCI CI 11
june 2019: underwater gas leak inspection at platform Panthere C Company: PETROCI CI 11
march 2019 underwater inspection of the structures of the platforms Gulftide, lion A, lion B, Panthere C Company: PETROCI CI 11
2014 - 2018: Annual maintenance contract for the submerged structures of PUMA ENERGY wharf
AUGUST 2017 JICA-ORICONTROLShipping underwater inspection in stores 5 and 6 of the Autonomous Port of Abidjan at Cerealier Port construction project
MARCH 2017- PETROCIWorks of removal and installation of chains of shields shock absorbers –dock PETROCI
WHARF CONSTRUCTION -MONO RIVER -TOGO
RIPE BERLINER PLATFORM CONSTRUCTION –COTE D’IVOIRE
WHARF CONSTRUCTION –JACQUEVILLE COTE D’IVOIRE
FOXTROT INTERNATIONAL 2023
Sample Description
INDUSTRIAL MAINTENANCE REFERENCES 2018: CALM IMODCO SIR II buoy revamping
2014 - 2018: Annual maintenance contract for the submerged structures of PUMA ENERGY wharf
AUGUST 2017 JICA-ORICONTROL

Shipping underwater inspection in stores 5 and 6 of the Autonomous Port of Abidjan at Cerealier Port construction project

MARCH 2017- PETROCI

Works of removal and installation of chains of shields shock absorbers –dock PETROCI

WHARF CONSTRUCTION -MONO RIVER -TOGO
RIPE BERLINER PLATFORM CONSTRUCTION –COTE D’IVOIRE
WHARF CONSTRUCTION –JACQUEVILLE COTE D’IVOIRE
BRIDGE HKB IN ABIDJAN D’IVOIRE IVOIRE Bathymetry and geotechnical survey Barge rental and concrete work
PIPELINE INSTALLATION -COTE D’IVOIRE Project Abidjan-Bouake: Welding and concrete work
BRIDGE CONSTRUCTION –COTE D’IVOIRE Project Jacqueville: Concrete work
CANAL DE VRIDI –COTE D’IVOIRE Project PAA: Dredging and rock filing work

In April 2015:Maintenance of cauls of motor-pumps fires GMP8 AND GMP5 , GESTOCI YAMOUSSOUKRO

March 2015: Examination of the chests of ammarage of the anchorage Puma

April, 2014: Crushing under sailors followed by cleaning out and extraction of solid waste and muck in the quay PAA

Fev 2014: Examination and jobs of maintenance of the emissary in sea as for SODECI

2011: Jobs of examination under navy of piles of bridges in Republic of MALI

Pose of tétrapodes / PASP

2006: Building of station Petroci Saint André Yopougon services

2012: Control of jobs of pose of behaviour of wastewater Cocody Blokosso

Examination of tube anodique

Maintenance of piles PETROCI

Building of quay d craft and of boundary on the ile of BROODED Jacqueville

Examination and pose of defence in bodin /SOTRA

Examination and pose of bucklers shock absorbers / PETROCI ANCHORAGE

Soldering of anodes puts inside Petroci

Maintenance of well anodes and of gate

JOBS CONTROL NDT, GRITTING AND PAINTING
Sept 21 to jan 2022:Cutting work of ferrule head - PAA cereal dock construction project Company: TOA COPORATION JICA
May 2019: gas leak repair work by laying PLIDCO Clamp on gas transmission line Company: PETROCI CI-11 AZITO
March 2020: Scouting work, location and repair of leaks by laying plidco clamp off kraffy Company: PETROCI CI-11 KRAFFY
June 2022: Inspection and cleaning of marine sewage outfalls at Vridi -Port boeut Company: SODECI ASSAINISSEMENT
juillet -2019: Underwater inspection has the driver's camera video pipe 30 panther c Company: PETROCI CI-11
juin-2019: underwater gas leak inspection at panther c platform Company: PETROCI CI-11
mars 2019: underwater inspection of the structures of the gulftide platform, lion A, lion B, Panther Company: PETROCI CI-11
oct.-21: underwater inspection of the marine structures of the Petroci wharf bunkers Company: ORYX
Fev 2022: underwater inspection of the marine structures of the Petroci wharf bunkers Company: ORYX
sept.-20: Inspection of submerged structures of the PUMA pier Company: CIC MARINE
Dec 2021: Inspection of submerged structures of the CHEC VRIDI AKO pier Company: CIC MARINE

March 2015: Measure of thickness of piles and dukes of albes of the anchorage PUMA ENERGY

Dec 2011: Measure of thickness puts inside of ammarage PAA

Janv on 2010: Gritting and surface painting on collector of slops QuaiPetroci

2012: Jobs of gritting put inside Petroci

TOPOGRAPHY AND BATHYMETRY WORKS
Ongoing: Infrastructure repair work at the puma pier Company: SIR
oct 2021-mars 2022: Realization of a bathymetric survey and inspection of the structures by divers Company: SIR
jan 2021-mars 2022: Realization of maritime surveys in the area of existing and future terminals (bathymetry, topography, currentology, sedimentology Company: SIR
dec 2021-feb 2022: work to bring the collapsed platforms on the EAST bank of the SIR platform into conformity Company: SIR
March 2021: Bathymetric survey at the socopao wharf Company: LBTP
Dec 2019: Bathymetric survey on the kossou river-project for the installation of photovoltaic power plants on the river Company: TRACTEBEL
April to May 2017: ARTELIA WATER & ENVIRONMENT

Topographic and bathymetric study on the river N'zi and hydroelectric Bandaman-projet of Tiassalé

Nov.- Dec 2016

Location of pipes buried in the channel of Vridi for SIR. Project of extension of channel of Vridi - Autonomous Port of Abidjan CIV

2014: Opinion poll couples of lateral sonar with the quay PAA as for SEA INVEST
March 2013: Jobs of noting down bathymetric Bridge BEDIE Riviera Marcory
SIMIC REFLEXION SONAR April 2021:Geophysical reconnaissance survey by seismic reflection - project to open the mouth of Grand Bassam Company: SGTM- MAROC
April 2022:Geophysical reconnaissance survey by lateral sonar -gas leak detection project at -100m Panthere C Company: PETROCI CI-11