SUBMARINE WORK AND INSPECTION

  •  Deep sea diving for inspection and movies
  •  Submarine cleaning with HP pump, hydraulic rotating brush, scraper.
  •  Installation and removal of bollard & beacon
  •  Consolidation of concrete wharf
  •  Installation of cofferdams, sheet piling; repair and consolidation works of art
  •  Installation, replacement and welding anodes on underwater Structures
  •  Measurement of wear chains and metal submerged structures
SUBMARINE WORKS AND INSPECTION
  • Deep sea diving for inspection and movies
  • Submarine cleaning with HP pump, hydraulic rotating brush, scraper.
  • Installation and removal of bollard & beacon
  • Consolidation of concrete wharf
  • Installation of cofferdams, sheet piling; repair and consolidation works of art
  • Installation, replacement and welding anodes on underwater Structures
  • Measurement of wear chains and metal submerged structures

Our communication system underwater and direct broadcast images underwater. Our magnetic sensor for underwater location of buried metal up to 2 meters. Our cutting and underwater welding system with direct connection to 36 volts source, thus avoiding the danger binds to the use of a generator.

HYDRAULIC UNIT FOR CLEANING AND SUBMARINE WORK
EQUIPMENT FOR WORK AND INSPECTION
CUTTING AND WELDING EQUIPMENT

PETROCI

  • Feb 2022: Installation of PLIDCO clamps on 8'' Panther C pipeline leak
  • Jan 2022: Zodiac refloating at the Gulftide platform
  • November 2019: Cleaning and installation of anodes on the submerged structures of the Gulftide platform, Lion A, LionB and Panther C
  • July 2019: Underwater inspection with the pipe 30 Panther C driver's video camera
  • June-2019: Underwater gas leak inspection at the Panther CC platform
  • March 2019: underwater inspection of the structures of the Gulftide, lion A, lion B, Panther C platforms
  • Sept.2018: Underwater leak inspection by ROV on 8'' panther C pipeline

PUMA ENERGY CI

  • July 2015:     Maintenance of the girds and strainers of pumps set fire to wharf PUMA
  • March 2015 : Inspection and measurements NDT of the immersed structures of the warf of PUMA
  • Jan 2015:     Service contract of the immersed structures of the wharf PUMA
  • Sept 2013 :  Service contract of the immersed structures of the wharf PUMA

TAURIAN/BONDOUKOU MANGANESE

  • Aug, 2015: work of removing and installing valves of hydro-agricultural dam KPODA department of BONDOUKOU
  • Jul,2015: Inspection camera underwater installations and valves hydro-agricultural dam KPODA departement of BONDOUKOU

GESTOCI( Petroleum Stock Management Company in Côte d'Ivoire)

  • 2015: Maintenance of cauls of motor-pumps fires on the Lake Zatta yamousoukro

SODECI (company for distribution of water in Côte d'Ivoire)

  • Jan, 2015: Maintenance work of the valves of the station of treatment of water at SEGUELLA
  • April 2014: Repair and maintenance work of the emissary at sea PORT BOUET ABIDJAN
  • Aug, 2013: Bathymetric, inspection andstatements for the localization of the emissary at sea PORT BOUET
  • Jan, 2013: Work of dredging at the station oftreatment of water of DIVO
  • Oct, 2013: Inspection campaign to the camera of the valves of the stations of treatment of water of DALOA, DUEKOUE, GAGNOA, ODIENNE, MINIGNAN, TOUBA
  • May 2012: Factory inspectorate of installation of control of waste waters of pumping station COCODY BLOKOSSO project PUR IV
  • Nov, 2010: Inspection with camera of the collector of repression of the water BLOKOSSO station COCODY BLOKOSSO

CIE (Ivorian Electricity Company)

  • March 2014 Assistance for work of batardage and debatardage G 10 and G 40 dam AYAME
  • February 2014: Support for the work of the cofferdam and debatardage Dam CIE AYAM
  • December 2013: Support for the work of the cofferdam and debatardage Dam CIE AYAME
  • Sept2013: Support for the work of the cofferdam and debatardage Dam CIE AYAME
  • 2005 - 2006: Treatment and crack injection in the side gallery dam BUYO

LBTP (Laboratory of Buildings and Public Works)

  • February 2011: Inspection of sole underwater bridge piers Kayes Bagoue kani and in the Republic of MALI

JICA STUDY TEAM (Japanese International Cooperation Agency)

  • 1999-2000: Study of the impact of major development projects on the environment in the Republic of Côte d'Ivoire
  • July 1999: Construction of surveying as part of the feasibility study on the western part of the Sanitation, Abidjan.

PAA (Autonomous Port of Abidjan)

  • Feb 2012: Inspection of Mooring coffers of lagoon water
  • July 2005: Blasting submarine trawler moored Coryphée 12 AAP.
  • Oct. 2004: Towing Coryphée stricken trawler Vridi the channel at anchor 12 AAP
  • Nov. 2003: Bailout PYRRHUS trawler fishing port.

PETROCI HOLDING

  • Jan 2014: Maintenance contract submerged structures Petroci jetty at large dock
  • Dec 2011: Maintenance of underwater structures of the pier at large dock Petroci
  • Dec 2010: Works underwater inspection of underwater structures
  • Feb 2010: Maintenance contract submerged structures Petroci jetty at large dock
  • Oct. 2010: repair the safe mooring of the pier VRIDI PETROCI
  • Aug 2009: strainers cleaning works fire pumps to large dock
  • May 2009 strainers cleaning works fire pumps to large dock
  • Nov. 2008: Research and underwater laying of the cannon fire hose at large dock
  • May 2008: Cleaning work strainers and fire pumps grids has the wharf
  • Nov. 2008: Research and underwater laying of the cannon fire hose at large dock
  • May 2008: Strainers Cleaning work and grids fire pumps the pier PETROCI VRIDI
  • July 2008: valve chamber construction work. Project pipeline Abidjan Bouaké (In subcontractor BAT SERVICE)
  • 2005- 2006: Construction Service Stations PETROCI SAINT ANDRE YOPOUGON (as subcontractor)

WFP (World Food Program)

  • February 2002: removal work and poses valves hydro agricultural dam KPODA / BONDOUKOU
  • July 2001: Underwater inspection camera to video installations of hydro agricultural dam KPODA / BONDOUKOU

BNETD (National Office of Development Studies)

  • May 2007 uncorking work of bottom outlet of storm basins Dokui PLATEAU of galleries and WILLIAMSVILLE through remediation of toxic waste
  • May 2001 work of unclogging storm basin of the gallery of PLATEAU Dokui

SIAP (Ivorian Company of Refuelling Tanker)

  • September 2009: Inspection of underwater video camera barge Vridi SIAP
  • September 2009: Hull cleaning team of divers from the barge VRIDI SIAP
  • April 2009: Underwater Survey and replacement of piping GUINDEAU

TP BACS (Ministry of Economic Infrastructures)

  • June 200: Construction of two access platforms on the island of COUVE / Jacqueville

SIR (Ivorian Company of Refinery)

  • September 2011 inspection filmed T3 of tank